Break open concrete floor and expose footing in proposed carbon fiber reinforcement installation areas. Remove all debris from concrete foundation wall and clean thoroughly. Expose sill plate/joist work and prepare for hardware mounting. Drill 1″ hole in concrete footing and clean debris from hole.
Generously cover concrete wall with resin and install carbon fiber strips directly to foundation wall. Run carbon fiber overtop of exposed footing and curl base of strip into footing. Fill 1″ hole with resin and coat entire front side of carbon fiber generously with resin. Fasten top of carbon fiber into sillplate/joistwork and tighten hardware.
Break open concrete floor and excavate sump basin at a dimension of approximately 2.5ft x 2.5ft x 3ft. Line perimeter of basin with filtercloth and drill 1/2” holes around complete perimeter of basin. Install basin and surround with 3/4“ clear gravel.
Install a 1/3hp oil cooled sump pump and connect pump exhaust line into. Reinstall concrete floor. Parge wall in sump box enclosure.
Reinstall concrete floor. Remove and dump all debris. All labour and materials included.