Lay down tarps and dig down to footing by hand in specified repair areas.
Repair all cracks and masonry voids in foundation wall below grade. Prime wall and apply rubberized membrane to repair area. Add a layer of mastic mesh, another layer of rubberized membrane, a layer of 12m plastic and fasten drainage board to grade with termination straps and concrete anchors.
Replace weeping tile system within repair area and cover with 6″ of 3/4″ clear gravel. Install a fresh vertical drain in window well and fasten egress window well to foundation wall. Backfill and power tamp dirt. Cover new drain in window well with 3/4″ clear gravel and level.
Backfill and power tamp dirt.