Repair all cracks and masonry voids in foundation wall below grade. Once cured, apply AB-720-38 rubberized membrane to repair area. Add a layer of mastic mesh, another layer of AB-720-38 rubberized membrane, a layer of 12m plastic and fasten drainage board to grade with termination straps and concrete anchors.
Replace weeping tile system within repair areas and cover with 6″ of 3/4″ clear gravel. Backfill and power tamp dirt.
]]>Repair all cracks and masonry voids in foundation wall below grade. Once cured, apply AB-720-38 rubberized membrane to repair area. Add a layer of mastic mesh, another layer of AB-720-38 rubberized membrane, a layer of 12m plastic and fasten drainage board to grade with termination straps and concrete anchors.
Replace weeping tile system within repair areas and cover with 6″ of 3/4″ clear gravel. Backfill and power tamp dirt.
]]>If we are unable to achieve the required installation torque and it becomes necessary to install additional piers to a greater depth, there will be an additional charge for each additional 5 foot extension that is installed. The required axial capacities may not be achievable due to the soil conditions.
Geotechnical engineer to witness installation and confirm pile type, torque values, and produce letter of conformity in order for the town to close the permit permits to be provided by client.
Repair all cracks and masonry voids in foundation wall below grade. Prime wall and apply rubberized membrane to repair area. Add a layer of mastic mesh, another layer of rubberized membrane, a layer of 12m plastic and fasten drainage board to grade with termination straps and concrete anchors.
Repair weeping tile system and cover with 6″ of 3/4″ clear gravel. Backfill and power tamp dirt. Remove and dump all debris. All labour and materials included.
]]>Once footing is cured, rebuild foundation walls with 10” block from base of footing to underside of existing joist work and fill cores of block work. Once complete, parge fresh foundation walls and let cure. Once cured, prime foundation wall and apply rubberized membrane waterproofing.
Fasten drainage board from grade to footing. Backfill and power tamp soil within repair area and reinstall patio slabs. Remove interior shoring and remove and dump all debris. All labour and materials included.
]]>Once footing is cured, rebuild foundation walls with 10” block from base of footing to underside of existing joistwork. Once complete, parge fresh foundation walls and let cure. Once cured, prime foundation wall and apply ruberized membrane waterproofing.
Fasten drainage board from grade to footing. Replace weeping tile system within repair areas and cover with 6″ of 3/4″ clear gravel. Backfill and power tamp dirt.
]]>Once vertical structure and joist work is secured, remove existing beam/load bearing columns from basement and dispose.
Install fresh vertical iron posts and plates where applicable and pour specified concrete footings for HSS posts. Fasten new vertical posts to IBEAM with approved hardware. Once post footings are cured, remove shoring and rest structure onto new post/footings installations. Remove and dump all debris.
]]>Form up proposed concrete footing and fill forms with 25 MPa concrete until full and install needle vibrator. Once cured, remove timber forms.
]]>Remove and dump all debris. All labour and materials included.
]]>Once footing is cured, rebuild foundation walls with 10” block from base of footing to underside of existing joistwork. Once complete, parge fresh foundation walls and let cure. Once cured, prime foundation wall and apply hydroshield ruberized membrane waterproofing.
Fasten drainage board from grade to footing. Backfill and power tamp soil within repair area and reinstall patio slabs. Remove interior shoring and remove and dump all debris. All labour and materials included.
]]>Once footing is cured, rebuild foundation walls with 10” block from base of footing to underside of existing joistwork. Once complete, parge fresh foundation walls and let cure. Once cured, prime foundation wall and apply hydroshield ruberized membrane waterproofing.
Fasten drainage board from grade to footing. Backfill and power tamp soil within repair area and reinstall patio slabs. Remove interior shoring and remove and dump all debris. All labour and materials included.
]]>